{"comps": {"land": [], "powered_shell": []}, "hero": {"composite_score": null, "computed_at": "2026-11-12T08:45:32.236785+00:00", "constraint_score": null, "excess_power": null, "iso": "WECC", "lat": 47.61, "lng": -122.34, "name": "Seattle", "queue_wait_months": null, "slug": "seattle", "state": "WA", "time_to_power_mo": null, "time_to_power_months": null, "verdict": "CAUTION"}, "is_pro": true, "kpis": {"facility_count": 151, "headline_basis": "every facility listing DC Hub tracks in this market (operational, under construction, planned and announced; verified and unverified listings included), deduplicated by name + operator across the facilities and discovered_facilities tables. MW is summed over the listings that report capacity (mw_reporting_count of facility_count), so read it as a floor.", "lease_rate": null, "mw_reporting_count": 12, "operational_mw": 450.0, "pipeline_mw": 0.0, "queue_months": null, "top_operator": {"facility_count": 7, "name": "Sabey"}, "total_mw": 416.0, "unverified_included": true, "vacancy_pct": null}, "live_as_of": {"age_hours": 0.1, "iso": "2026-11-12T08:45:32.236785+00:00"}, "ma": [], "ok": true, "open_access": "Open to every caller: this is one of the 20 largest US data-center markets by tracked capacity, and its full market briefing (grid, risk, time to power, scores) is free.", "operators": [{"facility_count": 7, "operator": "Sabey", "ranked_by": "facility_count", "total_mw": 192.0}, {"facility_count": 5, "operator": "H5 Data Centers", "ranked_by": "facility_count", "total_mw": 36.0}, {"facility_count": 4, "operator": "Sabey Data Centers", "ranked_by": "facility_count", "total_mw": 40.0}, {"facility_count": 4, "operator": "Digital Realty", "ranked_by": "facility_count", "total_mw": 14.0}, {"facility_count": 4, "operator": "DataBank", "ranked_by": "facility_count", "total_mw": 0.0}], "outlook": {"generated_at": "2026-11-10T05:27:31.624648+00:00", "narrative_md": "# Seattle Data Center Market Brief\n\nSeattle's data center footprint spans 151 tracked facilities totaling 416 MW across operational, under-construction, and planned sites. Sabey operates the largest portfolio with 11 facilities across its distinct entities, followed by H5 Data Centers, Digital Realty, and DataBank each holding 4\u20135 sites.\n\nThis pairing means new data center power procurement will require explicit coordination with utility interconnection timelines and potential upgrades to local feed architecture. Developers cannot assume grid headroom will translate to simple power access; permitting and interconnection windows will likely extend project timelines.\n\nNo recent deals are currently tracked in Seattle's registry, leaving operator expansion intent opaque. Historical capital raises tied to Sabey and related regional operators have anchored significant infrastructure investment across the Pacific Northwest, yet the absence of recorded recent transaction activity suggests either consolidation pauses or deal activity below tracking thresholds. The region's operator dynamics remain stable but not visibly shifting through announced M&A, facility sales, or new entrant acquisitions.\n\nSeattle's power and supply environment will depend heavily on utility-led grid upgrades and whether regional demand growth prompts coordinated interconnection scheduling across the 151-site base.", "rationale": null, "verdict": "CAUTION", "word_count": 229}, "pipeline": [], "power_grid": {"gen_additions_mw": 850.0, "interconnection_pending_mw": null, "iso": "WECC", "iso_queue": null, "queue_capacity_mw": null, "queue_wait_months": null, "reserve_margin_pct": null, "time_to_power_as_of": "2026-11-12T08:45:32.236785+00:00", "time_to_power_basis": "DCPI modelled months to energize a new large load in this market (method: https://dchub.cloud/dcpi/methodology); a model estimate, not a utility date", "time_to_power_months": null}, "redirect_to": null, "requested": "seattle", "risk": {"drought_months_d2_plus": null, "errors": {"drought_months_d2_plus": "no_drought_source_ingested"}, "water_band": 1, "water_band_label": "Low", "water_category": "mean of 115 Aqueduct 4.0 baseline-annual basins (arid counted as", "water_stress": 11.1, "wildfire_seismic_note": "WUI wildfire exposure + Pacific seismic zones; check CalOES + USGS hazard layers before final site selection."}, "slug": "seattle", "tier": "FREE", "_gated": true, "_locked_fields": ["constraint_score", "excess_power", "excess_power_score", "reserve_margin_pct", "time_to_power_mo", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}