{"comps": {"land": [], "powered_shell": []}, "hero": {"composite_score": null, "computed_at": "2026-11-12T08:45:16.925787+00:00", "constraint_score": null, "excess_power": null, "iso": "ERCOT", "lat": 29.45, "lng": -98.69, "name": "San Antonio", "queue_wait_months": null, "slug": "san-antonio", "state": "TX", "time_to_power_mo": null, "time_to_power_months": null, "verdict": "CAUTION"}, "is_pro": true, "kpis": {"facility_count": 78, "headline_basis": "every facility listing DC Hub tracks in this market (operational, under construction, planned and announced; verified and unverified listings included), deduplicated by name + operator across the facilities and discovered_facilities tables. MW is summed over the listings that report capacity (mw_reporting_count of facility_count), so read it as a floor.", "lease_rate": null, "mw_reporting_count": 12, "operational_mw": 897.0, "pipeline_mw": 0.0, "queue_months": null, "top_operator": {"facility_count": 11, "name": "Microsoft"}, "total_mw": 1747.0, "unverified_included": true, "vacancy_pct": null}, "live_as_of": {"age_hours": 0.3, "iso": "2026-11-12T08:45:16.925787+00:00"}, "ma": [], "ok": true, "open_access": "Open to every caller: this is one of the 20 largest US data-center markets by tracked capacity, and its full market briefing (grid, risk, time to power, scores) is free.", "operators": [{"facility_count": 11, "operator": "Microsoft", "ranked_by": "facility_count", "total_mw": 700.0}, {"facility_count": 9, "operator": "CyrusOne", "ranked_by": "facility_count", "total_mw": 57.0}, {"facility_count": 4, "operator": "Vantage Data Centers", "ranked_by": "facility_count", "total_mw": 0.0}, {"facility_count": 3, "operator": "H5 Data Centers", "ranked_by": "facility_count", "total_mw": 75.0}, {"facility_count": 2, "operator": "Amazon Web Services", "ranked_by": "facility_count", "total_mw": 0.0}], "outlook": {"generated_at": "2026-11-07T09:23:29.097238+00:00", "narrative_md": "San Antonio's tracked data center footprint spans 78 facilities totaling 1,747 MW across operational, under-construction, and planned sites. Microsoft operates 11 tracked facilities\u2014the largest single operator\u2014followed by CyrusOne with 9 and Vantage Data Centers with 4. The market has drawn regulatory attention: city officials have adopted stricter approval processes for new data center development, and Texas Research Park has emerged as a focal point for regional deployment.\n\nThis pairing means operators pursuing incremental capacity will encounter elevated friction in securing grid access and managing interconnection timelines; it does not preclude new builds, but it narrows the margin for oversized power bids or aggressive multi-site expansion plans without prior offtake certainty.\n\nNo recent deals are currently tracked in San Antonio, leaving operator consolidation and capacity transfers opaque.\n\nRegulatory scrutiny and the CAUTION verdict together suggest San Antonio's next phase will hinge on grid infrastructure upgrades and interconnection queue management rather than land or operator availability. Watch for announcements of transmission or substation investments tied to specific facility phases.", "rationale": null, "verdict": "CAUTION", "word_count": 256}, "pipeline": [], "power_grid": {"gen_additions_mw": 19969.0, "interconnection_pending_mw": 446265.84, "iso": "ERCOT", "iso_queue": {"as_of": "2026-10-31", "as_of_basis": "published_report", "basis_note": "ERCOT's published active generation interconnection requests (ERCOT's own report: the GIS Summary or the Monthly Operational Overview, named in queued_generation_gw_source); separate from the large-load queue", "iso": "ERCOT", "queue_kind": "large_load", "queued_generation_gw": 461.4, "source_name": "ERCOT large-load queue (Senate presentation Jul 29 2026; June 19 LLWG) + generation queue (Oct 31 2026)", "source_url": "https://www.ercot.com/files/docs/2026/06/18/June-19-LLWG-Report.pptx"}, "queue_capacity_mw": 464943.5, "queue_wait_months": null, "reserve_margin_pct": null, "time_to_power_as_of": "2026-11-12T08:45:16.925787+00:00", "time_to_power_basis": "DCPI modelled months to energize a new large load in this market (method: https://dchub.cloud/dcpi/methodology); a model estimate, not a utility date", "time_to_power_months": null}, "redirect_to": null, "requested": "san-antonio", "risk": {"drought_months_d2_plus": null, "errors": {"drought_months_d2_plus": "no_drought_source_ingested"}, "water_band": 3, "water_band_label": "Medium-High", "water_category": "mean of 229 Aqueduct 4.0 baseline-annual basins (arid counted as", "water_stress": 55.9, "wildfire_seismic_note": null}, "slug": "san-antonio", "tier": "FREE", "_gated": true, "_locked_fields": ["constraint_score", "excess_power", "excess_power_score", "reserve_margin_pct", "time_to_power_mo", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}