{"comps": {"land": [], "powered_shell": []}, "hero": {"composite_score": null, "computed_at": "2026-11-12T08:46:14.520936+00:00", "constraint_score": null, "excess_power": null, "iso": "WECC", "lat": 39.53, "lng": -119.79, "name": "Reno", "queue_wait_months": null, "slug": "reno", "state": "NV", "time_to_power_mo": null, "time_to_power_months": null, "verdict": "CAUTION"}, "is_pro": true, "kpis": {"facility_count": 63, "headline_basis": "every facility listing DC Hub tracks in this market (operational, under construction, planned and announced; verified and unverified listings included), deduplicated by name + operator across the facilities and discovered_facilities tables. MW is summed over the listings that report capacity (mw_reporting_count of facility_count), so read it as a floor.", "lease_rate": null, "mw_reporting_count": 9, "operational_mw": 1355.0, "pipeline_mw": 341.0, "queue_months": null, "top_operator": {"facility_count": 5, "name": "Switch"}, "total_mw": 866.0, "unverified_included": true, "vacancy_pct": null}, "live_as_of": {"age_hours": 0.1, "iso": "2026-11-12T08:46:14.520936+00:00"}, "ma": [], "ok": true, "open_access": "Open to every caller: this is one of the 20 largest US data-center markets by tracked capacity, and its full market briefing (grid, risk, time to power, scores) is free.", "operators": [{"facility_count": 5, "operator": "Switch", "ranked_by": "facility_count", "total_mw": 350.0}, {"facility_count": 2, "operator": "Microsoft", "ranked_by": "facility_count", "total_mw": 60.0}, {"facility_count": 2, "operator": "Cogent Communications, Inc.", "ranked_by": "facility_count", "total_mw": 0.0}, {"facility_count": 1, "operator": "EdgeCore Digital Infrastructure", "ranked_by": "facility_count", "total_mw": 216.0}, {"facility_count": 1, "operator": "PowerHouse Data Centers", "ranked_by": "facility_count", "total_mw": 65.0}], "outlook": {"generated_at": "2026-11-07T09:22:02.449000+00:00", "narrative_md": "# Reno Data Center Market Brief\n\nReno's tracked data center footprint spans 866 MW across 63 facilities, with Switch operating the largest portfolio at five sites. The NV Energy-Tract lawsuit continues to draw media and transparency scrutiny, signaling ongoing tension around power procurement and grid access in the region.\n\nThe DCPI verdict of CAUTION reflects mixed signals on new power availability. This pairing\u2014neither abundant nor severely restricted\u2014means new power projects face neither straightforward access nor insurmountable barriers, but rather requires site-specific negotiation and timing discipline around NV Energy's capacity and network upgrades.\n\nDeal flow in Reno remains minimal with no recent tracked transactions, yet operator concentration tells a different story. Switch's five-site footprint positions it as the dominant player, while Cogent Communications and Microsoft each operate two facilities.\n\nPower procurement dynamics will remain the central variable shaping Reno's competitive position through 2026, particularly as the utility litigation resolves and construction projects reach operational phase.", "rationale": null, "verdict": "CAUTION", "word_count": 202}, "pipeline": [{"eta": null, "facility": "EdgeCore Reno Campus (TRIC)", "operator": "EdgeCore Digital Infrastructure", "power_mw": 216.0, "status": "Under Construction"}, {"eta": null, "facility": "PowerHouse Reno", "operator": "PowerHouse Data Centers", "power_mw": 65.0, "status": "Under Construction"}, {"eta": null, "facility": "Microsoft Silver Springs NV", "operator": "Microsoft", "power_mw": 60.0, "status": "Planned"}, {"eta": null, "facility": "Microsoft Silver Springs Nevada", "operator": "Microsoft", "power_mw": null, "status": "Planned"}], "power_grid": {"gen_additions_mw": 741.5, "interconnection_pending_mw": null, "iso": "WECC", "iso_queue": null, "queue_capacity_mw": 16392.2, "queue_wait_months": null, "reserve_margin_pct": null, "time_to_power_as_of": "2026-11-12T08:46:14.520936+00:00", "time_to_power_basis": "DCPI modelled months to energize a new large load in this market (method: https://dchub.cloud/dcpi/methodology); a model estimate, not a utility date", "time_to_power_months": null}, "redirect_to": null, "requested": "reno", "risk": {"drought_months_d2_plus": null, "errors": {"drought_months_d2_plus": "no_drought_source_ingested"}, "water_band": 4, "water_band_label": "High", "water_category": "mean of 90 Aqueduct 4.0 baseline-annual basins (arid counted as ", "water_stress": 78.6, "wildfire_seismic_note": "WUI wildfire exposure + Pacific seismic zones; check CalOES + USGS hazard layers before final site selection."}, "slug": "reno", "tier": "FREE", "_gated": true, "_locked_fields": ["constraint_score", "excess_power", "excess_power_score", "reserve_margin_pct", "time_to_power_mo", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}