{"comps": {"land": [], "powered_shell": []}, "hero": {"composite_score": null, "computed_at": "2026-11-12T08:48:10.908660+00:00", "constraint_score": null, "excess_power": null, "iso": "WECC", "lat": 45.51, "lng": -122.68, "name": "Portland", "queue_wait_months": null, "slug": "portland-or", "state": "OR", "time_to_power_mo": null, "time_to_power_months": null, "verdict": "CAUTION"}, "is_pro": true, "kpis": {"facility_count": 72, "headline_basis": "every facility listing DC Hub tracks in this market (operational, under construction, planned and announced; verified and unverified listings included), deduplicated by name + operator across the facilities and discovered_facilities tables. MW is summed over the listings that report capacity (mw_reporting_count of facility_count), so read it as a floor.", "lease_rate": null, "mw_reporting_count": 7, "operational_mw": 328.0, "pipeline_mw": 0.0, "queue_months": null, "top_operator": {"facility_count": 4, "name": "Stack Infrastructure"}, "total_mw": 273.0, "unverified_included": true, "vacancy_pct": null}, "live_as_of": {"age_hours": 0.4, "iso": "2026-11-12T08:48:10.908660+00:00"}, "ma": [], "ok": true, "open_access": "Open to every caller: this is one of the 20 largest US data-center markets by tracked capacity, and its full market briefing (grid, risk, time to power, scores) is free.", "operators": [{"facility_count": 4, "operator": "Stack Infrastructure", "ranked_by": "facility_count", "total_mw": 60.0}, {"facility_count": 4, "operator": "Flexential", "ranked_by": "facility_count", "total_mw": 25.0}, {"facility_count": 4, "operator": "Flexential Corp.", "ranked_by": "facility_count", "total_mw": 0.0}, {"facility_count": 3, "operator": "EdgeConneX", "ranked_by": "facility_count", "total_mw": 35.0}, {"facility_count": 3, "operator": "Quality Technology Services", "ranked_by": "facility_count", "total_mw": 0.0}], "outlook": {"generated_at": "2026-11-10T05:27:23.385322+00:00", "narrative_md": "# Portland Data Center Market Brief\n\nPortland's data center footprint spans 72 tracked facilities totaling 273 MW, with Stack Infrastructure and Flexential operating the largest clusters. The market is fragmented across multiple operators, with Stack Infrastructure and Flexential each running four sites, followed by Quality Technology Services and EdgeConneX with three sites each. Power distribution remains uneven across the portfolio, reflecting the region's variable infrastructure maturity.\n\nThis combination suggests that while power is not acutely scarce, operators planning expansions should expect deliberate project lead times and grid coordination challenges rather than rapid deployment windows.\n\nRecent deal activity in the Portland region remains muted at the tracked level. News reports indicate Portland is attracting developer interest, including proposals to convert office towers into data center space and heightened municipal attention to transparency in deal structuring. The operator base shows no signs of consolidation, with five distinct players maintaining operational or planned assets across the market.", "rationale": null, "verdict": "CAUTION", "word_count": 229}, "pipeline": [], "power_grid": {"gen_additions_mw": 66.8, "interconnection_pending_mw": null, "iso": "WECC", "iso_queue": null, "queue_capacity_mw": null, "queue_wait_months": null, "reserve_margin_pct": null, "time_to_power_as_of": "2026-11-12T08:48:10.908660+00:00", "time_to_power_basis": "DCPI modelled months to energize a new large load in this market (method: https://dchub.cloud/dcpi/methodology); a model estimate, not a utility date", "time_to_power_months": null}, "redirect_to": null, "requested": "portland-or", "risk": {"drought_months_d2_plus": null, "errors": {"drought_months_d2_plus": "no_drought_source_ingested"}, "water_band": 3, "water_band_label": "Medium-High", "water_category": "mean of 105 Aqueduct 4.0 baseline-annual basins (arid counted as", "water_stress": 42.4, "wildfire_seismic_note": "WUI wildfire exposure + Pacific seismic zones; check CalOES + USGS hazard layers before final site selection."}, "slug": "portland-or", "tier": "FREE", "_gated": true, "_locked_fields": ["constraint_score", "excess_power", "excess_power_score", "reserve_margin_pct", "time_to_power_mo", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}