{"comps": {"land": [], "powered_shell": []}, "hero": {"composite_score": null, "computed_at": "2026-11-12T08:45:22.730716+00:00", "constraint_score": null, "excess_power": null, "iso": "CAISO", "lat": 34.05, "lng": -118.26, "name": "Los Angeles", "queue_wait_months": null, "slug": "los-angeles", "state": "CA", "time_to_power_mo": null, "time_to_power_months": null, "verdict": "CAUTION"}, "is_pro": true, "kpis": {"facility_count": 209, "headline_basis": "every facility listing DC Hub tracks in this market (operational, under construction, planned and announced; verified and unverified listings included), deduplicated by name + operator across the facilities and discovered_facilities tables. MW is summed over the listings that report capacity (mw_reporting_count of facility_count), so read it as a floor.", "lease_rate": null, "mw_reporting_count": 7, "operational_mw": 383.0, "pipeline_mw": 0.0, "queue_months": null, "top_operator": {"facility_count": 7, "name": "Equinix"}, "total_mw": 303.0, "unverified_included": true, "vacancy_pct": null}, "live_as_of": {"age_hours": 0.1, "iso": "2026-11-12T08:45:22.730716+00:00"}, "ma": [], "ok": true, "open_access": "Open to every caller: this is one of the 20 largest US data-center markets by tracked capacity, and its full market briefing (grid, risk, time to power, scores) is free.", "operators": [{"facility_count": 7, "operator": "Equinix", "ranked_by": "facility_count", "total_mw": 80.0}, {"facility_count": 6, "operator": "Digital Realty", "ranked_by": "facility_count", "total_mw": 74.0}, {"facility_count": 6, "operator": "CoreSite", "ranked_by": "facility_count", "total_mw": 70.0}, {"facility_count": 5, "operator": "Colocation America Corporation", "ranked_by": "facility_count", "total_mw": 0.0}, {"facility_count": 4, "operator": "Enzu", "ranked_by": "facility_count", "total_mw": 0.0}], "outlook": {"generated_at": "2026-11-10T05:27:15.473750+00:00", "narrative_md": "Los Angeles data center market spans 209 tracked facilities totaling 303 MW, with Equinix leading operator presence at seven sites, followed by CoreSite and Digital Realty each at six. The market remains highly fragmented across top-five operators controlling only 28 facilities, indicating distributed infrastructure ownership and significant mid-tier operator participation. No recent deal activity has been tracked in the Los Angeles market segment.\n\nThis combination signals that while additional power supply routes may exist, securing new capacity will face meaningful interconnection, transmission, or procurement friction.\n\nOperator concentration remains moderate. Equinix's seven-site presence represents the largest single footprint but accounts for less than 3.5% of tracked facilities, underscoring the market's polyglot structure. CoreSite, Digital Realty, Colocation America Corporation, and Enzu round out the top five, each managing between four and six sites. The absence of recent deal flow prevents assessment of consolidation velocity or operator repositioning activity.", "rationale": null, "verdict": "CAUTION", "word_count": 228}, "pipeline": [{"eta": null, "facility": "Arcadian Infracom Los Angeles PoP", "operator": "Arcadian Infracom", "power_mw": null, "status": "Under Construction"}], "power_grid": {"gen_additions_mw": 7828.5, "interconnection_pending_mw": 164842.32, "iso": "CAISO", "iso_queue": {"as_of": "2026-07-16", "as_of_basis": "source_file_date", "basis_note": "Active only, Net MW to grid (Public Queue Report) + Cluster 15 and Cluster 16 requests (NET MW at POI); co-located hybrid projects counted once; excludes Completed (built) and Withdrawn. Since 2026-10-20 this total includes Clusters 15 and 16, which the Public Queue Report alone did not list (that is why it rose from ~74 GW)", "iso": "CAISO", "queue_kind": "generation_queue", "queued_generation_gw": 164.8, "source_files": [{"file_date": "2026-11-11T09:02:58+00:00", "gw": 73.75, "rows": 260, "url": "https://www.caiso.com/documents/publicqueuereport.xlsx"}, {"file_date": "2026-07-16T21:57:50+00:00", "gw": 28.45, "rows": 86, "url": "https://www.caiso.com/documents/cluster-15-interconnection-requests.xlsx"}, {"file_date": "2026-10-16T18:10:38+00:00", "gw": 62.65, "rows": 226, "url": "https://www.caiso.com/documents/cluster-16-queue-report.xlsx"}], "source_name": "CAISO queue reports: Public Queue Report (ACTIVE, Net MWs to Grid) + Cluster 15 + Cluster 16 (NET MW POI)", "source_url": "https://www.caiso.com/generation-transmission/generation/generator-interconnection"}, "queue_capacity_mw": 131442.6, "queue_wait_months": null, "reserve_margin_pct": null, "time_to_power_as_of": "2026-11-12T08:45:22.730716+00:00", "time_to_power_basis": "DCPI modelled months to energize a new large load in this market (method: https://dchub.cloud/dcpi/methodology); a model estimate, not a utility date", "time_to_power_months": null}, "redirect_to": null, "requested": "los-angeles", "risk": {"drought_months_d2_plus": null, "errors": {"drought_months_d2_plus": "no_drought_source_ingested"}, "water_band": 4, "water_band_label": "High", "water_category": "mean of 213 Aqueduct 4.0 baseline-annual basins (arid counted as", "water_stress": 63.6, "wildfire_seismic_note": "WUI wildfire exposure + Pacific seismic zones; check CalOES + USGS hazard layers before final site selection."}, "slug": "los-angeles", "tier": "FREE", "_gated": true, "_locked_fields": ["constraint_score", "excess_power", "excess_power_score", "reserve_margin_pct", "time_to_power_mo", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}