{"comps": {"land": [], "powered_shell": []}, "hero": {"composite_score": null, "computed_at": "2026-11-12T08:45:27.253785+00:00", "constraint_score": null, "excess_power": null, "iso": "SPP", "lat": 39.1, "lng": -94.58, "name": "Kansas City", "queue_wait_months": null, "slug": "kansas-city", "state": "MO", "time_to_power_mo": null, "time_to_power_months": null, "verdict": "BUILD"}, "is_pro": true, "kpis": {"facility_count": 110, "headline_basis": "every facility listing DC Hub tracks in this market (operational, under construction, planned and announced; verified and unverified listings included), deduplicated by name + operator across the facilities and discovered_facilities tables. MW is summed over the listings that report capacity (mw_reporting_count of facility_count), so read it as a floor.", "lease_rate": null, "mw_reporting_count": 16, "operational_mw": 861.0, "pipeline_mw": 277.0, "queue_months": null, "top_operator": {"facility_count": 5, "name": "DataBank"}, "total_mw": 2351.0, "unverified_included": true, "vacancy_pct": null}, "live_as_of": {"age_hours": 0.4, "iso": "2026-11-12T08:45:27.253785+00:00"}, "ma": [{"buyer": "Google", "date": null, "mw": null, "seller": null, "type": "investment", "value": 10000.0, "value_unit": "USD millions"}, {"buyer": "Digital Realty", "date": null, "mw": null, "seller": null, "type": "acquisition", "value": 475.0, "value_unit": "USD millions"}], "ok": true, "open_access": "Open to every caller: this is one of the 20 largest US data-center markets by tracked capacity, and its full market briefing (grid, risk, time to power, scores) is free.", "operators": [{"facility_count": 5, "operator": "DataBank", "ranked_by": "facility_count", "total_mw": 14.0}, {"facility_count": 4, "operator": "Google", "ranked_by": "facility_count", "total_mw": 802.0}, {"facility_count": 3, "operator": "Meta", "ranked_by": "facility_count", "total_mw": 425.0}, {"facility_count": 2, "operator": "Netrality", "ranked_by": "facility_count", "total_mw": 25.0}, {"facility_count": 2, "operator": "Lumen Technologies Inc", "ranked_by": "facility_count", "total_mw": 0.0}], "outlook": {"generated_at": "2026-11-07T09:03:30.695166+00:00", "narrative_md": "# Kansas City Data Center Market Brief\n\nKansas City operates 110 tracked facilities totaling 2,351 MW across all development stages, with DataBank, Google, and Meta collectively operating 12 sites. The market hosts a diversified operator base beyond the top three, indicating established infrastructure maturity and multi-tenant appeal. Facility count and megawatt volume place Kansas City among active regional markets, though the deployment landscape includes sites under construction, planned, and unverified listings alongside operational assets.\n\nThis combination suggests that new power can be sourced and delivered to the market, though project developers will encounter real infrastructure coordination costs. The verdict does not address demand, economics, or competitive positioning; it reflects supply-side feasibility for incremental capacity.\n\nDeal flow activity is visible but sparse in recent tracking windows. Digital Realty has also signaled expansion intent through land acquisition tied to AI-driven data center development in the region. Community and municipal pushback on proposed projects in Independence and downtown Kansas City suggests that permitting and local approval remain friction points separate from power availability. This opposition has delayed voting on downtown proposals but does not alter underlying power economics.\n\nRegulatory and community sentiment will shape implementation velocity more than power supply over the next 18\u201324 months.", "rationale": null, "verdict": "BUILD", "word_count": 241}, "pipeline": [{"eta": null, "facility": "Lambda Kansas City", "operator": "Lambda", "power_mw": 100.0, "status": "Planned"}, {"eta": null, "facility": "Google Kansas City Building 2", "operator": "Google", "power_mw": 100.0, "status": "Under Construction"}, {"eta": null, "facility": "Meta Kansas City Building 2", "operator": "Meta", "power_mw": 75.0, "status": "Under Construction"}, {"eta": null, "facility": "Google Kansas City #2 (Project Mica)", "operator": "Google", "power_mw": 2.0, "status": "Planned"}], "power_grid": {"gen_additions_mw": 1681.8, "interconnection_pending_mw": 32700.05, "iso": "SPP", "iso_queue": {"as_of": "2026-11-12", "as_of_basis": "live_feed_fetch_date", "basis_note": "Active requests, max summer MW; excludes cessation", "iso": "SPP", "queue_kind": "generation_queue", "queued_generation_gw": 185.9, "source_name": "SPP GI active requests (MAX Summer MW, excl. cessation)", "source_url": "https://opsportal.spp.org/Studies/GenerateActiveCsv"}, "queue_capacity_mw": 16772.2, "queue_wait_months": null, "reserve_margin_pct": null, "time_to_power_as_of": "2026-11-12T08:45:27.253785+00:00", "time_to_power_basis": "DCPI modelled months to energize a new large load in this market (method: https://dchub.cloud/dcpi/methodology); a model estimate, not a utility date", "time_to_power_months": null}, "redirect_to": null, "requested": "kansas-city", "risk": {"drought_months_d2_plus": null, "errors": {"drought_months_d2_plus": "no_drought_source_ingested"}, "water_band": 2, "water_band_label": "Low-Medium", "water_category": "mean of 70 Aqueduct 4.0 baseline-annual basins (arid counted as ", "water_stress": 19.3, "wildfire_seismic_note": null}, "slug": "kansas-city", "tier": "FREE", "_gated": true, "_locked_fields": ["constraint_score", "excess_power", "excess_power_score", "reserve_margin_pct", "time_to_power_mo", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}