{"comps": {"land": [], "powered_shell": []}, "hero": {"composite_score": null, "computed_at": "2026-11-12T08:46:05.361583+00:00", "constraint_score": null, "excess_power": null, "iso": "ERCOT", "lat": 32.91, "lng": -97.26, "name": "Fort Worth", "queue_wait_months": null, "slug": "fort-worth", "state": "TX", "time_to_power_mo": null, "time_to_power_months": null, "verdict": "CAUTION"}, "is_pro": true, "kpis": {"facility_count": 20, "headline_basis": "every facility listing DC Hub tracks in this market (operational, under construction, planned and announced; verified and unverified listings included), deduplicated by name + operator across the facilities and discovered_facilities tables. MW is summed over the listings that report capacity (mw_reporting_count of facility_count), so read it as a floor.", "lease_rate": null, "mw_reporting_count": 1, "operational_mw": 1834.0, "pipeline_mw": 1624.0, "queue_months": null, "top_operator": {"facility_count": 2, "name": "QTS Realty"}, "total_mw": 80.0, "unverified_included": true, "vacancy_pct": null}, "live_as_of": {"age_hours": 0.2, "iso": "2026-11-12T08:46:05.361583+00:00"}, "ma": [{"buyer": "Stack", "date": "2026-10-19", "mw": null, "seller": null, "type": "New Build", "value": 540.0, "value_unit": "USD millions"}, {"buyer": "Amazon", "date": "2026-09-30", "mw": null, "seller": null, "type": "New Build", "value": 430.0, "value_unit": "USD millions"}, {"buyer": "QTS", "date": "2026-08-19", "mw": 48.0, "seller": null, "type": "Power Agreement", "value": null, "value_unit": "USD millions"}, {"buyer": "Compass", "date": "2026-06-05", "mw": null, "seller": null, "type": "Equity", "value": 15.0, "value_unit": "USD millions"}], "ok": true, "open_access": "Open to every caller: this is one of the 20 largest US data-center markets by tracked capacity, and its full market briefing (grid, risk, time to power, scores) is free.", "operators": [{"facility_count": 2, "operator": "QTS Realty", "ranked_by": "facility_count", "total_mw": 0.0}, {"facility_count": 2, "operator": "Meta", "ranked_by": "facility_count", "total_mw": 0.0}, {"facility_count": 1, "operator": "Edged", "ranked_by": "facility_count", "total_mw": 80.0}, {"facility_count": 1, "operator": "CITIGROUP TECHNOLOGY INC", "ranked_by": "facility_count", "total_mw": 0.0}, {"facility_count": 1, "operator": "Cyxtera", "ranked_by": "facility_count", "total_mw": 0.0}], "outlook": {"generated_at": "2026-11-06T09:54:44.198375+00:00", "narrative_md": "# Fort Worth Data Center Market Analysis\n\nFort Worth's tracked portfolio comprises 20 facilities with fragmented operator control and no recent M&A activity. QTS Realty and Meta each operate two sites; Alpheus Communications, Centersquare, and other operators hold single facilities. However, no tracked sales, acquisitions, or lease deals have closed recently, leaving operator positioning static.\n\nThe DCPI verdict of Caution reflects moderate tension between power availability and demand. Together, these scores signal that incremental power for new facilities is feasible but not assured without grid or utility investment. Operators seeking to add capacity should expect standard lead times for utility coordination rather than either wide-open availability or acute shortage scenarios.\n\nQTS Realty and Meta's dual-site presence in Fort Worth may reflect legacy positioning rather than active expansion; without recent deal records, their investment roadmaps remain opaque. Smaller operators including Alpheus and Centersquare hold single assets, typical of pre-consolidation market structure.", "rationale": null, "verdict": "CAUTION", "word_count": 239}, "pipeline": [{"eta": null, "facility": "Yondr Lancaster (Dallas Campus)", "operator": "Yondr Group", "power_mw": 550.0, "status": "Planned"}, {"eta": null, "facility": "Anthropic Texas AI Campus", "operator": "Anthropic / Fluidstack", "power_mw": 300.0, "status": "Planned"}, {"eta": null, "facility": "Crow Holdings / CleanArc - Stemmons Corridor", "operator": "Crow Holdings", "power_mw": 245.0, "status": "Planned"}, {"eta": null, "facility": "PowerHouse Irving (Las Colinas)", "operator": "PowerHouse Data Centers", "power_mw": 201.0, "status": "Under Construction"}, {"eta": null, "facility": "CoreWeave Helios TX (Core Scientific)", "operator": "CoreWeave", "power_mw": 200.0, "status": "Under Construction"}, {"eta": null, "facility": "Edged Texas 1", "operator": "Edged", "power_mw": 80.0, "status": "Under Construction"}, {"eta": null, "facility": "QTS DFW-3", "operator": "QTS", "power_mw": 48.0, "status": "Under Construction"}, {"eta": null, "facility": "Arcadian Infracom Dallas PoP", "operator": "Arcadian Infracom", "power_mw": null, "status": "Planned"}], "power_grid": {"gen_additions_mw": 19969.0, "interconnection_pending_mw": 446265.84, "iso": "ERCOT", "iso_queue": {"as_of": "2026-10-31", "as_of_basis": "published_report", "basis_note": "ERCOT's published active generation interconnection requests (ERCOT's own report: the GIS Summary or the Monthly Operational Overview, named in queued_generation_gw_source); separate from the large-load queue", "iso": "ERCOT", "queue_kind": "large_load", "queued_generation_gw": 461.4, "source_name": "ERCOT large-load queue (Senate presentation Jul 29 2026; June 19 LLWG) + generation queue (Oct 31 2026)", "source_url": "https://www.ercot.com/files/docs/2026/06/18/June-19-LLWG-Report.pptx"}, "queue_capacity_mw": 464943.5, "queue_wait_months": null, "reserve_margin_pct": null, "time_to_power_as_of": "2026-11-12T08:46:05.361583+00:00", "time_to_power_basis": "DCPI modelled months to energize a new large load in this market (method: https://dchub.cloud/dcpi/methodology); a model estimate, not a utility date", "time_to_power_months": null}, "redirect_to": null, "requested": "fort-worth", "risk": {"drought_months_d2_plus": null, "errors": {"drought_months_d2_plus": "no_drought_source_ingested"}, "water_band": 3, "water_band_label": "Medium-High", "water_category": "mean of 229 Aqueduct 4.0 baseline-annual basins (arid counted as", "water_stress": 55.9, "wildfire_seismic_note": null}, "slug": "fort-worth", "tier": "FREE", "_gated": true, "_locked_fields": ["constraint_score", "excess_power", "excess_power_score", "reserve_margin_pct", "time_to_power_mo", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}