{"comps": {"land": [], "powered_shell": []}, "hero": {"composite_score": null, "computed_at": "2026-11-12T08:45:50.450278+00:00", "constraint_score": null, "excess_power": null, "iso": "WECC", "lat": 33.27, "lng": -111.88, "name": "Chandler", "queue_wait_months": null, "slug": "chandler", "state": "AZ", "time_to_power_mo": null, "time_to_power_months": null, "verdict": "BUILD"}, "is_pro": true, "kpis": {"facility_count": 26, "headline_basis": "every facility listing DC Hub tracks in this market (operational, under construction, planned and announced; verified and unverified listings included), deduplicated by name + operator across the facilities and discovered_facilities tables. MW is summed over the listings that report capacity (mw_reporting_count of facility_count), so read it as a floor.", "lease_rate": null, "mw_reporting_count": 3, "operational_mw": 1843.0, "pipeline_mw": 502.0, "queue_months": null, "top_operator": {"facility_count": 10, "name": "CyrusOne"}, "total_mw": 143.0, "unverified_included": true, "vacancy_pct": null}, "live_as_of": {"age_hours": 0.1, "iso": "2026-11-12T08:45:50.450278+00:00"}, "ma": [], "ok": true, "open_access": "Open to every caller: this is one of the 20 largest US data-center markets by tracked capacity, and its full market briefing (grid, risk, time to power, scores) is free.", "operators": [{"facility_count": 10, "operator": "CyrusOne", "ranked_by": "facility_count", "total_mw": 68.0}, {"facility_count": 3, "operator": "H5 Data Centers", "ranked_by": "facility_count", "total_mw": 75.0}, {"facility_count": 1, "operator": "DataBank", "ranked_by": "facility_count", "total_mw": 0.0}, {"facility_count": 1, "operator": "All About Serving Process Server", "ranked_by": "facility_count", "total_mw": 0.0}, {"facility_count": 1, "operator": "Emailage", "ranked_by": "facility_count", "total_mw": 0.0}], "outlook": {"generated_at": "2026-11-07T09:49:54.446103+00:00", "narrative_md": "Chandler's tracked portfolio spans 143 MW across 26 facilities, with CyrusOne operating the largest footprint at 10 sites. The market is anchored by a mix of hyperscale and mid-market operators, though recent deal activity remains absent from tracking. Recent news coverage indicates the Chandler data center campus is entering a growth phase with large user commitments, signaling sustained demand.\n\nThe DCPI verdict of BUILD reflects favorable power conditions for new capacity development.\n\nNo recent M&A or capital transactions are tracked in Chandler at present. The operator base remains fragmented, with CyrusOne holding material presence while other carriers maintain single or low-digit facility counts. The absence of deal flow does not reflect power stress or competitive consolidation; rather, it aligns with a market positioned for organic build activity rather than portfolio roll-ups. Nearby Phoenix has seen selective M&A\u2014including RadiusDC's acquisition of PhoenixNAP's operations\u2014but Chandler's own transaction silence suggests operators are focused on development rather than acquisition.\n\nChandler's power position and growth trajectory position it as an active build market within Arizona's data center corridor for the near term.", "rationale": null, "verdict": "BUILD", "word_count": 253}, "pipeline": [{"eta": null, "facility": "Compass Goodyear Campus (Phoenix)", "operator": "Compass Datacenters", "power_mw": 212.0, "status": "Under Construction"}, {"eta": null, "facility": "Novva Project Borealis Phase 1", "operator": "Novva Data Centers", "power_mw": 96.0, "status": "Under Construction"}, {"eta": null, "facility": "EdgeCore Mesa Campus PH02", "operator": "EdgeCore Digital Infrastructure", "power_mw": 72.0, "status": "Under Construction"}, {"eta": null, "facility": "EdgeCore Mesa Campus PH03", "operator": "EdgeCore Digital Infrastructure", "power_mw": 72.0, "status": "Under Construction"}, {"eta": null, "facility": "H5 Chandler 2", "operator": "H5 Data Centers", "power_mw": 50.0, "status": "Under Construction"}, {"eta": null, "facility": "Novva Mesa Campus", "operator": "Novva Data Centers", "power_mw": null, "status": "Under Construction"}, {"eta": null, "facility": "Arcadian Infracom Phoenix PoP", "operator": "Arcadian Infracom", "power_mw": null, "status": "Under Construction"}], "power_grid": {"gen_additions_mw": 4640.6, "interconnection_pending_mw": null, "iso": "WECC", "iso_queue": null, "queue_capacity_mw": 13740.0, "queue_wait_months": null, "reserve_margin_pct": null, "time_to_power_as_of": "2026-11-12T08:45:50.450278+00:00", "time_to_power_basis": "DCPI modelled months to energize a new large load in this market (method: https://dchub.cloud/dcpi/methodology); a model estimate, not a utility date", "time_to_power_months": null}, "redirect_to": null, "requested": "chandler", "risk": {"drought_months_d2_plus": null, "errors": {"drought_months_d2_plus": "no_drought_source_ingested"}, "water_band": 4, "water_band_label": "High", "water_category": "mean of 110 Aqueduct 4.0 baseline-annual basins (arid counted as", "water_stress": 71.8, "wildfire_seismic_note": null}, "slug": "chandler", "tier": "FREE", "_gated": true, "_locked_fields": ["constraint_score", "excess_power", "excess_power_score", "reserve_margin_pct", "time_to_power_mo", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}