{"comps": {"land": [], "powered_shell": []}, "hero": {"composite_score": null, "computed_at": "2026-11-12T08:47:33.904384+00:00", "constraint_score": null, "excess_power": null, "iso": "SOCO", "lat": 33.75, "lng": -84.53, "name": "ATLANTA", "queue_wait_months": null, "slug": "atlanta", "state": "GA", "time_to_power_mo": null, "time_to_power_months": null, "verdict": "AVOID"}, "is_pro": true, "kpis": {"facility_count": 206, "headline_basis": "every facility listing DC Hub tracks in this market (operational, under construction, planned and announced; verified and unverified listings included), deduplicated by name + operator across the facilities and discovered_facilities tables. MW is summed over the listings that report capacity (mw_reporting_count of facility_count), so read it as a floor.", "lease_rate": null, "mw_reporting_count": 23, "operational_mw": 1372.0, "pipeline_mw": 832.0, "queue_months": null, "top_operator": {"facility_count": 11, "name": "Digital Realty"}, "total_mw": 2332.0, "unverified_included": true, "vacancy_pct": null}, "live_as_of": {"age_hours": 0.0, "iso": "2026-11-12T08:47:33.904384+00:00"}, "ma": [], "ok": true, "open_access": "Open to every caller: this is one of the 20 largest US data-center markets by tracked capacity, and its full market briefing (grid, risk, time to power, scores) is free.", "operators": [{"facility_count": 11, "operator": "Digital Realty", "ranked_by": "facility_count", "total_mw": 500.0}, {"facility_count": 11, "operator": "Flexential", "ranked_by": "facility_count", "total_mw": 10.0}, {"facility_count": 7, "operator": "DataBank", "ranked_by": "facility_count", "total_mw": 15.0}, {"facility_count": 5, "operator": "Switch", "ranked_by": "facility_count", "total_mw": 480.0}, {"facility_count": 4, "operator": "Equinix", "ranked_by": "facility_count", "total_mw": 70.0}], "outlook": {"generated_at": "2026-11-09T09:01:36.316447+00:00", "narrative_md": "# Atlanta Data Center Market Brief\n\nThe top four operators\u2014Flexential and Digital Realty (11 facilities each), DataBank (7), and Switch (5)\u2014control approximately half the tracked base, leaving significant fragmentation across smaller and unverified listings.\n\nThe verdict to avoid reflects the difficulty of securing incremental supply at scale, not market demand or facility quality; operators will face extended timelines and elevated costs for new power connections or upgrades.\n\nRecent deal flow includes a lease arrangement involving QumulusAI, though terms and counterparty identity remain unreported. The broader Atlanta region shows active development: Carrier Connect recently secured a 4 MW lease for an entire facility outside the city limits, suggesting operators are finding capacity by expanding beyond core metros. Regional news has flagged Atlanta as a top market for data center construction, though local and state leadership discussions around potential moratoriums reflect tension between growth velocity and infrastructure strain.\n\nThe combination of tight power availability and ongoing construction velocity creates an asymmetric market where new entrants face meaningfully harder power procurement than existing operators with established utility relationships.", "rationale": null, "verdict": "AVOID", "word_count": 271}, "pipeline": [{"eta": null, "facility": "Microsoft Fairwater AI Superfactory", "operator": "Microsoft", "power_mw": 500.0, "status": "Under Construction"}, {"eta": null, "facility": "Equinix Hampton xScale Campus", "operator": "Equinix", "power_mw": 240.0, "status": "Under Construction"}, {"eta": null, "facility": "ServerFarm Covington", "operator": "ServerFarm", "power_mw": 60.0, "status": "Planned"}, {"eta": null, "facility": "Form8tion Atlanta 1", "operator": "Form8tion", "power_mw": 30.0, "status": "Under Construction"}, {"eta": null, "facility": "Southeast Property Holdings Hampton", "operator": "Southeast Property Holdings", "power_mw": 2.0, "status": "Planned"}, {"eta": null, "facility": "THE KEEP 2 CAMPUS", "operator": null, "power_mw": null, "status": "Planned"}, {"eta": null, "facility": "DCB ATLANTA EAST, LLC", "operator": null, "power_mw": null, "status": "Planned"}, {"eta": null, "facility": "SDC ATLA", "operator": null, "power_mw": null, "status": "Planned"}], "power_grid": {"gen_additions_mw": 743.8, "interconnection_pending_mw": null, "iso": "SOCO", "iso_queue": null, "queue_capacity_mw": null, "queue_wait_months": null, "reserve_margin_pct": null, "time_to_power_as_of": "2026-11-12T08:47:33.904384+00:00", "time_to_power_basis": "DCPI modelled months to energize a new large load in this market (method: https://dchub.cloud/dcpi/methodology); a model estimate, not a utility date", "time_to_power_months": null}, "redirect_to": null, "requested": "atlanta", "risk": {"drought_months_d2_plus": null, "errors": {"drought_months_d2_plus": "no_drought_source_ingested"}, "water_band": 2, "water_band_label": "Low-Medium", "water_category": "mean of 54 Aqueduct 4.0 baseline-annual basins (arid counted as ", "water_stress": 35.2, "wildfire_seismic_note": null}, "slug": "atlanta", "tier": "FREE", "_gated": true, "_locked_fields": ["constraint_score", "excess_power", "excess_power_score", "reserve_margin_pct", "time_to_power_mo", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}